Welcome
Projects • Engineering
IRJ MPD Junction Plate Clamp
In-Riser Joint clamp with sliding junction plate that eases installation of the Managed Pressure Drilling stab plate.
VBR Test Rig
Hydraulic test rig to validate VBR design strength; translating load carriage, pivoting flange plate.
Asphaltene Inhibitor Pressure Vessel
Portable pressure vessel with custom side-mounted sensor back-pressurized chamber to evaluate asphaltene inhibitor performance at working pipeline conditions.